Vesgantti 143.7" Oversized Boneless Couch, Modern 7 Seater Modular Sectional by Vesgantti

Vesgantti 143.7" Oversized Boneless Couch, Modern 7 Seater Modular Sectional

$2,861.05
Sale price  $2,861.05 Regular price 
Skip to product information
Vesgantti 143.7" Oversized Boneless Couch, Modern 7 Seater Modular Sectional by Vesgantti

Vesgantti 143.7" Oversized Boneless Couch, Modern 7 Seater Modular Sectional

$2,861.05
Sale price  $2,861.05 Regular price 

Product Overview

Built for bedrooms from the ground up, the Vesgantti 143.7" Oversized Boneless Couch, Modern 7 Seater Modular Sectional Sofa with Deep Seat, Convertible Chenille Cloud Couches for Living Room, No Assembly Required, Dark Grey combines durable quality with lasting comfort. measuring 112.2"D x 143.7"W x 31.5"H, weighing 3850 Pounds, available in Dark Grey. Notable features include flexible modular and modular design, contributing to its sturdy character.

Key Features

  • Flexible Modular Design: The L-shaped sectional sofa has 4 separate sections. Each module can be easily moved and reassembled into loveseat, L shaped sofa, chaise lounge, sleeper sofa, or oversized family sectional couch to match your lifestyle. The modular design allows you to freely create your ideal layout and adapt to ever-changing spaces. All modular seats have a anti-slip design on the bottom to prevent the sofa from sliding during daily use
  • Spacious & Comfortable: The 114 inch modular sofa features 31.5 inch width and 29.5 inch deep seats, providing ample seating space to lounge for you and your family, especially perfert for heavy people. 9.8 inch wide armrests is an ideal place for placing drinks or laptop. The setional couch can easily transforms any room into a warm and comfortable haven for relaxing, entertaining guests, or enjoying a family movie night
  • Durable and Long-lasting Support: This modern sofa is crafted entirely from high-resilience foam, providing lasting support and ultimate comfort. The foam utilizes quick rebound technology, maintaining its shape after prolonged use while providing a comfortable and stable seat. This full foam couch is perfect for a living room, bedroom, office, apartment, guest rooms, and children's play areas, encouraging children to play on its luxurious surface
  • Premium Chenille Fabric: The modular sectional sofa is made of high-quality chenille fabric, which is soft, pill-resistant and pet-friendly; ensuring long-term durability and making it perfect for daily use. The stylish and solid color design adds a touch of luxury and enhances the beauty of your living space. We have a variety of colors for option to meet different decoration styles (Note: Colors may vary slightly due to lighting or monitor settings)
  • No Assembly Required: No tools or complicated setup are required. Our modular couch is vacuum-packed; just simply unpack, gently pat the sections, and wait 72 hours for fully expand. Ultimate comfort and convenience are at your fingertips. The boneless sofa is packaged in 2 boxes, which may arrive on different days. Before assembling, please check all packages. If you have any questions or are dissatisfied with our sofa, please feel free to contact us

Why Choose the Vesgantti 143.7" Oversized Boneless Couch

The Vesgantti 143.7" Oversized Boneless Couch, Modern 7 Seater Modular Sectional Sofa with Deep Seat, Convertible Chenille Cloud Couches for Living Room, No Assembly Required, Dark Grey earns repeat purchases through comfortable construction and flexible modular, both delivering simple assembly.

Best For

The Vesgantti 143.7" Oversized Boneless Couch is best suited for: a living room, daily use.

Quick Summary

The Vesgantti 143.7" Oversized Boneless Couch is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: No. Seat Depth: 29.5 inches. Seat Height: 17.7 Inches. Weight Limit: 3850 Pounds. Price: $1682.97.

Product Specifications

Specification Details
Brand Vesgantti
Assembly Required No
Seat Depth 29.5 inches
Seat Height 17.7 Inches
Weight Limit 3850 Pounds
Seating Capacity 7.0
Product Dimensions 112.2"D x 143.7"W x 31.5"H
Item Weight 85 Pounds
Type Sectional
Color Dark Grey

You may also like